Hi thanks for the info. I’ve got a 2009 tacoma and went with a simple, no screws elevated system. I’ve also got a mx series ARE shell with rack rails so I’ll probably take too much stuff now. Oh well. My question is: how did you attach the plywood to the life gate? My carpentry/construction skills are best illustrated by the “Homer Simpson spice rack”. You used the existing holes in the tail gate, but did you put the tail gate cover back on the tail gate and put the plywood over it and screw thru both or ditch the cover? Thanks

For example: Imagine walking into a slightly weathered coffee shop on Main Street, middle America. It’s charming in its own unique way. You sit down to enjoy a cup of coffee as you skim through the tabletop jukebox. Then the bill comes. “$10 for a cup of coffee? In this rundown joint!” This might be what comes to mind if the price of the service doesn’t meet the expectations you had when you first walked into the business.


What I have done in my man cave of a shop is to install above my finishing table a strip of track lighting where I have fixtures ranging from the typical bright white incandescent (typically around 4700k) all the way to the average halogen spot that I figure someone would use with an art piece (normally around 3700K). this allows me to point each light and view my piece and finish under varying light conditions to judge whether or not I prefer a particular finish or not. It also helps in photographing items (though filming is a whole nother story, I still have my 5400k T8 overheads for working).
Different approach in that they hung one end of the sleeping platform with hooks and U bolts. One of the best write ups with full details about rigging up an electrical system with second batteries and an isolator, as well as using power inverters. They were then able to incorporate cool things like a mini fridge, lights, and mini PC fans for air circulation.
Keep your air hose and fittings in one place and out of the way. Screw a coffee can onto a scrap piece of plywood. Attach a 2-1/2 in. riser block to the edge of the plywood and hang the entire contraption from a wall or work-bench. Drape your air hose over the coffee can, and store your fittings inside. It also works great for hanging extension cords. — Walter Barndt. Build an air compressor cart.
In addition to sheer power, look for a model with a built-in thermostat so you can set it and forget it. This convenience feature is well worth it so you don’t have to stop what you’re doing mid-project to manually turn your heater on and off to maintain your desired temp. A good garage heater will mount to the wall or ceiling to save space and will come with a durable housing and full safety screen to keep dust and wood chips from reaching the heating elements and starting a fire.
Make sure the room or building you are planning to utilize has sufficient lighting and electrical outlets to allow you to see what you are doing, and to work without excessive extension cords. You should also remember that many tools require a fairly substantial amperage to operate, so you need to make sure the wiring is capable of handling the loads. 20 Amp circuits will work for ordinary 120V tools, but air compressors and welders may require 40 Amp, 220V circuits.
While a single great product can’t usually support a whole business, it is beneficial to select one or two “headline” products that will form the cornerstone of your offering. This will often be an obvious choice: If you’re a coffee shop, your headline product will be coffee. If you’re a burger joint, you guessed it, it’ll be burgers. This product will often be the centerpiece of your marketing efforts and a way for you to “own” a space in a customer’s mind. For example, Jack’s Burgers makes the best cheeseburger in town and Daisy’s Threads has the most adorable scarves.

After a permit has been issued, the building inspector will want to be notified at various points during your build in order to do a site visit, walk around and inspect the details to make sure that they meet code requirements. These inspections are commonly at the point where excavation work is complete, when the foundation is completed but before back-filling, when framing and all structural work has been done, after the installation of the insulation and vapour barrier, and then a final inspection after everything is complete. You may need to have a separate plumbing inspector if you’re adding or changing plumbing fixtures, and electrical work will need to be inspected by the appro­priate electrical inspector (in Ontario, the Electrical Safety Authority). In my experience, inspectors appreciate good work, a clean, safe site, and are willing to work with hom­eowners and builders to make sure that the work will meet code and will endure.
The on the go mode is ideal for when I’m just driving all day and need to pull over and get some rest, be it in a parking lot, a residential cul-de-suc, or wherever. I usually toss a couple of items in the cab of my truck and crawl into the “coffin” sleeping arrangement for a quick night’s rest, but I can also crawl in without placing anything in the cab.
×